Quote.
Mr and Mrs Wang
Keymer
17 Walton Way
BN10 4WA
Tools are already supplied by the workers.
Materials:
87.5 Double socket rest bend, quote: 12719-73/   £11.48
Underground pipe 6m pack (2x3m) plain ended kite marked, quote: 14129-73/ U/ground pipe brown. £16.17
Pipe couplers single socket, quote: 13738-73/ £2.97
Back inlet bottle gully, quote: 10965-73/ 200mm riser, quote: 12051-73/ bottle gully. £7.23
Mini- access chamber 3 inlet base, Quote: 18837-73/ £22.97 quote: 11153-73/ £14.46
4trade builders rubble sacks, (10pack x2) quote: 2223807-73 £5.00
Labour costs:
4 builders: £50 per person, £200 per day. 7 days, £1400
Travelling costs:
Company van/ petrol costs: £140 for 7days.
Two motor vehicles/ petrol costs: £70 for 7days.
Total pricing for keymer job:
Travelling: shipping: labour: P+P:                                £1,682.32
Method statement
We will put on our PPE on before we start the installation of the underground drainage. Then we will get rid of the earth in the area that we need to work in. To install the drainage system. We will start by installing a bottle gully then we will attach the 90 degree radius to it and attach the other side to the man hole, we will then link it up to the underground pipe that leads to the sewage system and test it all to make sure there is no leaks or blockages in the set up.
Materials
Double socket
Rest bend
Underground pipe
Pipe couplers
Single socket
Bottle gully
Riser
Mini access chamber 3 inlet base (man whole)
Rubble bags
Radius 90
Tools
Shovel
Saw
Tape measure
Bung
Broom
Bin
Dustpan and brush
Common defects of underground drainage
1)      Blockage in the drains, this means you will have to dig down to the gutter to find your problem.

2)      Roots from trees and plants over growing and breaking the drains, which leads to leaks and water not being able to pass through.

3)      Damage to the pipes, thermal and ground movements can cause the pipes to come out of the sockets.
Limitations for pipes
Pipe joints can only take so much pressure before they can start to break.  So before using pipes you should research on how much pressure certain pipes can take.
Most pipes are made of plastic which means they can bend, this is a big limitation as the pipes need to then be cut and jointed.
RISK ASSESMENT.
Place: 17 Walton way, Keymer
Date: 13/06/2012- 20/06/2012
Activity:   Installing underground drainage
Risk Assessment Done By: Crookes Crooked Construction & Co.
Hazard identified:
1.      Working in confined spaces
2.      Working with heavy materials such as piping
3.      Trench collapsing
Who might be harmed:
1.      The people working in the trench
2.      The people working in the trench
3.      Anyone down in the trench at the time of collapsing
Risk level:
1.     Low
2.     Medium
3.     High
Control measured required:
1.      Take your time working and not have anything down the trench that isn’t needed at the time
2.      Taking your time and more then one person lifting the heavy materials to make it easier
3.      Move the earth we dug out away from the trench and compact the side of the trench so there is no loose earth