Tuesday, 13 September 2011
Task 1, Brick Moving.
The task i had to face was to move 60 bricks from one room to another.
I followed the instructions and used them as steps to the final outcome, my first step of the task was to read the job sheet which told me the task i had to do. I then carried out a risk assessment on my partner Joe to see if he was ok with the job, this risk assessment mainly involved healthy joints in the body and if we were durable for handling carrying the materials. Next i carried out a risk assessment on the task i hand, these things involved if the job was safe enough and to mention the hazards and how to keep safe. My next step was to check the delivery ticket i was issued to check we had the right quantity and the right product there was two faults with the item which were the wrong bricks and less quantity, once this was done we were able to sign the ticket to show the materials was delivered. The next step was to check the access route from the 2 rooms and make sure there was no hazards and was properly safe, i wedged doors open so i didn't not have to take my hands off the bricks. i then put on correct PPE for the job, these were steel toe cap boots, goggles and goggles once i knew i was protected from hazards i could start the job. The amount of bricks i carried at one time was 6 and used a Jenga style, this secured the bricks in my hands and was able to let me carry the right amount at one time. This job finished fairly quickly and once this was done i grabbed a broom and dust pan &brush to sweep up the room i used to ensure i left it how i started. The last task was to inform the boss the job was done.
Subscribe to:
Post Comments (Atom)
Harley
ReplyDeleteThe task was to move bricks not replace a pallet of bricks. What hazards did you identified?
Well done very good first blog add the above and see pictures. Me and Mark will sort the pictures out for you to add later.
John
Well done Harley.
ReplyDeleteJohn