Wednesday, 8 February 2012

English bond

Our task was to was to builld a english bond, this was the hardest bond to make because there are 2 courses to the bond. The first bond are side by side with a 10mm gap between each brick and the next course are brick to brick. we built the wall 8 bricks high and 6 bricks long. the PPE i used for this task was gloves, goggles and steel toe cap boots. after i layed each course i checked it was level, strait and the right height and length. Once this was done i cleaned up my area and told the tutor.

1 comment:

  1. Well done good blog just needs a photo to help with the description.

    ReplyDelete