Wednesday, 10 October 2012

Patio


Common defects to patio slabs.

           You need to get the slant right when doing patio slabs. If the slant is too steep it will not be easy/ safe to walk on. But if the slant isn’t steep enough, water will sit on the slabs.

Also if you put too much cement under the slabs it hard to get them in the right position, because they float around.

Common materials used.

Cement

Patio slabs

Possible defects in materials.

Patio slabs can crack, then moisture gets into the cracks and rots away the patio slab inside out.

Tools, power tools and materials used to carry out the task.

Brick trowel

Level

Wheelbarrow

Bin

Dustpan and brush

4 bits of wood

Cement

Method statement:

First we placed for 4 blobs of pug on the floor for each slab so that when you place the tile down it will spread it out and not compact, we then placed two slabs down and levelled them out with a slight slant left to right to stop the water / rain piling up and forming puddles, the slant will take the water to one side. We then followed this technique levelling them out along but making a slant left to right to stop the rain making puddles.


 

57 Dale Drive, Patcham, Brighton  BN1 8MY

TEL: 01273 506843   Mob: 07654323765   Fax: 0161 728 3172                  

                                                                       

 

RISK ANALYSIS SHEET

 

Activity / Operation ~                     Repairing patio slabs

 

Identifying Hazard ~                       Heavy materials / pug (lime)

 

                                **************************************************

RISK ASSESSMENT

 

        SEVERITY                                                            LIKELIHOOD     

 

High                    Fatality, Major Injury or                                High                    Certain or Near                                 Illness Causing Long Term                                                     Certain to Occur.

                                Disability

 

Medium            Injury or Illness Causing                                Medium            Reasonably Likely

                                Short Term Disability.                                                                     To Occur        

 

        Low                             Other Injury or Illness                                    Low                     Very Seldom or                                                                                                                                                 Never occurs  

**************************************************      

                     S/L RATIO

                                                                                Plot assessment of SEVERITY

L/H         M/H       H/H                                                        vs LIKELIHOOD and highlight                                                                                       value obtained.

                L/M        M/M     H/M

                                                                                                H/H: Avoid wherever possible.

L/L          M/L        H/L                                                         L/L:  minimal risk.

 

                 ******************************************************

SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK

 

Protective equipment - Gloves / Goggles or safety glasses / Dust Mask / Safety Shoes

 

A qualified electrician must make all electrical connections.  All test PAT Test certification is in place.

Quote

 

Dear Customer

 

 

We have inspected your roof and you need new felt and batten around roof

 

Next we will get the scaffolding up to get accesses to roof more easily and got a skip

 

Strip all felt and rotten batten

 

We then replace they felt and battens needed because of a hole in felt and battens were rotting away

 

Attach felt and batten

 

Then we will finish the last touches that need to be done. (plus clearance)

 

Times

2 days 8hrs

 

Cost

The costs of all the materials plus the scaffolding, Skip and job will cost £3,085 plus VAT.

 

   Scaffolding £1,800

  Skip £195

   Ladders £150

   Materials £420

   Lader £20 per hour

   Overhead (petrol,PPE,permit) £200

 

total cost £3,085


 

 

No comments: