Common defects to
patio slabs.
You
need to get the slant right when doing patio slabs. If the slant is too steep
it will not be easy/ safe to walk on. But if the slant isn’t steep enough,
water will sit on the slabs.
Also if you put too much cement
under the slabs it hard to get them in the right position, because they float
around.
Common
materials used.
Cement
Patio slabs
Possible
defects in materials.
Patio slabs can crack, then
moisture gets into the cracks and rots away the patio slab inside out.
Tools,
power tools and materials used to carry out the task.
Brick trowel
Level
Wheelbarrow
Bin
Dustpan and brush
4 bits of wood
Cement
Method statement:
First we placed for 4 blobs of pug on the floor for each
slab so that when you place the tile down it will spread it out and not
compact, we then placed two slabs down and levelled them out with a slight
slant left to right to stop the water / rain piling up and forming puddles, the
slant will take the water to one side. We then followed this technique
levelling them out along but making a slant left to right to stop the rain
making puddles.
57
Dale Drive, Patcham, Brighton BN1 8MY
TEL: 01273 506843 Mob: 07654323765 Fax: 0161 728 3172
RISK ANALYSIS SHEET
Activity /
Operation ~ Repairing patio slabs
Identifying Hazard ~ Heavy
materials / pug (lime)
**************************************************
RISK ASSESSMENT
SEVERITY LIKELIHOOD
High Fatality, Major Injury or High Certain or Near Illness Causing Long Term Certain
to Occur.
Disability
Medium Injury or Illness Causing Medium
Reasonably Likely
Short Term Disability. To
Occur
Low Other Injury or Illness Low Very Seldom or Never
occurs
**************************************************
S/L RATIO
Plot
assessment of SEVERITY
L/H M/H H/H vs
LIKELIHOOD and highlight value obtained.
H/H:
Avoid wherever possible.
L/L M/L H/L L/L: minimal risk.
******************************************************
SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK
Protective equipment - Gloves / Goggles or safety
glasses / Dust Mask / Safety Shoes
A qualified
electrician must make all electrical connections. All test PAT Test certification is in place.
Quote
Dear Customer
We have
inspected your roof and you need new felt and batten around roof
Next we will
get the scaffolding up to get accesses to roof more easily and got a skip
Strip all
felt and rotten batten
We then
replace they felt and battens needed because of a hole in felt and battens were
rotting away
Attach felt
and batten
Then we will
finish the last touches that need to be done. (plus clearance)
Times
2
days 8hrs
Cost
The costs of
all the materials plus the scaffolding, Skip and job will cost £3,085
plus VAT.
• Scaffolding £1,800
• Skip £195
• Ladders £150
• Lader £20 per hour
• Overhead (petrol,PPE,permit) £200
total cost £3,085