Wednesday, 28 November 2012

copper pipe

Copper pipe

Common defects to copper pipe work.
Heating up the copper to much and melting bits away casuing leaks.
Not joining the pipe work up correctly and causing leaks.
Bending the pipes to far so water cannot pass through it.
Common materials used.
Copper pipe
Flax
Copper joints
Defects in materials.
When upu heat up the copper it can melt away and cause leakes.
Bending the piopes to much will cause water not to pass through and will cause leakes/ burst pipes.
Copper is a conductor so when hot water passes through it gets very very hot so touching it will burn you.
Tools, powertools and materials used.
Blowtourch
Metal cloth
Flax
A 2 inch brush
Pipe cutters

57 Dale Drive, Patcham, Brighton  BN1 8MY
TEL: 01273 506843   Mob: 07654323765   Fax: 0161 728 3172                                                      
RISK ANALYSIS SHEET
Activity / Operation ~                    Repairing copper pipe
Identifying Hazard ~                       Chemical substance / hot materials / explosive tool
**************************************************
RISK ASSESSMENT
        SEVERITY                                                            LIKELIHOOD     
High                    Fatality, Major Injury or                                High                    Certain or Near                                 Illness Causing Long Term                                                     Certain to Occur.
                                Disability


Medium           Injury or Illness Causing                               Medium           Reasonably Likely
                                Short Term Disability.                                                                    To Occur        


Low                     Other Injury or Illness                                   Low                     Very Seldom or                                                                                                                                                Never occurs  
**************************************************      
                     S/L RATIO
                                                                                Plot assessment of SEVERITY
L/H         M/H       H/H                                                        vs LIKELIHOOD and highlight                                                                                      value obtained.
                L/M        M/M      H/M
                                                                                                H/H: Avoid wherever possible.
L/L          M/L        H/L                                                         L/L:  minimal risk.

                 ******************************************************
SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK

Protective equipment - Gloves / Goggles / Safety Shoes / Face mask

Method statement.

1)     Before we started work we needed to put on appropiate PPE for this job which consisted of;
Steel toe cap boots
Protective Gloves
 
2)     One we entered the work place we assesed the copper pipe we would be ammending, we knew from the pipe that is would be a patch repair.

3)     We then isolated the water supply so no water would be running through the pipes, we then drained the pipes  and put a bucket underneath so no water would hit the floor causing a potential flood.

4)     Once we knew there was no water left in the pipes we cut through the area that was faulty, we measured the faulty bit of pipe and cut out a new one.

5)     When it was ready we then soldered the pipe together so make it secure.

6)     Lastly we turned the water back on and run the taps to see if there was any leaks in the pipe, once we knew it was a perfect we then cleared up and left then site 

Mr Wooder
11 Eastbourne road, Worthing east Sussex bn6 7uy
After my trip to your property I have assessed what needs doing and have attached a quote, it should take me no more than one day; to repair your door lock.
Materials:
2m length of copper pipe   £12
Copper joints £5
Gas canister £3
Flax £2

Labour costs:
£50.00 a day
Overhead costs:
Petrol money £15.00
Total pricing for job:
Travelling: shipping: labour: P+P:         £87                    
Vat (17.5%)                                      £15.225    
Total Price including V.A.T    £102.22 

Thank you very much for picking Crookes Crooked Construction & Co.