Wednesday, 28 November 2012

guttering


Thursday, 15 November 2012

Guttering


Common defects

Not getting the slant right so the water doesn’t flow.

Not connecting the guttering up correctly and getting leaks.

`Cutting the guttering to short.

Common materials used

Plastic guttering

Metal guttering

Common defect in materials.

Plastic can split and leak.

Metal can rust away.

Tools, power tools and materials used.

Tennon saw

Tape measure

Power drill

2 inch screws

String line

Plastic guttering

Plastic brackets

Plastic stop end

Plastic joints

Bucket.


 

 

57 Dale Drive, Patcham, Brighton  BN1 8MY

TEL: 01273 506843   Mob: 07654323765   Fax: 0161 728 3172                  

RISK ANALYSIS SHEET

Activity / Operation ~                    Preplacing the guttering

Identifying Hazard ~                       Working at heights / working with long material /      Water leaking

                                **************************************************

RISK ASSESSMENT

        SEVERITY                                                            LIKELIHOOD     

 

High                    Fatality, Major Injury or                                High                    Certain or Near                                 Illness Causing Long Term                                                     Certain to Occur.

                                Disability

Medium           Injury or Illness Causing                               Medium           Reasonably Likely

                                Short Term Disability.                                                                    To Occur        

 


Low                     Other Injury or Illness                                   Low                     Very Seldom or                                                                                                                                                Never occurs  

**************************************************      

                     S/L RATIO

                                                                                Plot assessment of SEVERITY

L/H         M/H       H/H                                                        vs LIKELIHOOD and highlight                                                                                      value obtained.

                L/M        M/M      H/M

                                                                                                H/H: Avoid wherever possible.

L/L          M/L H/L L/L: minimal risk.
 

 

                 ******************************************************

SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK

Protective equipment - Gloves / Goggles or safety glasses / Safety Shoes

 

 

Method Statement

 

1.       The First thing we need to do is  put on our correct PPE which will be

Steel Toe Cap boots

Protective Gloves

 

2.       We will then start to take down the old gutter, we will do this by un screwing the brackets and carefully taking the gutter down.

 

3.       Once that is done the new brackets will be ready to put on, we will re mark the guttering from the end of the wall, we will find the highest point of the wall that we can start with the new gutter and start putting in the first bracket. Once we know how many meters the guttering will be we will drop the guttering by 2mm every meter so the water is able to run freely without getting blocked.

 

4.       Now the brackets are on we will start to fix the joints to the gutter and put them to the brackets, once we know its secure, tested that there is no leaks and running properly we will clean up and the job will be finished.

 

Quote

Mr mann

 

After my trip to your property I have assessed what needs doing and have attached a quote, I will need one of my workers  for this job, it will be, it should take us approximately  a days work for us to finish your job at our professional level.

 

The materials i need for the work,

10m of Guttering £20.00

5 Gutter Brackets £ 10.00

5 Gutter Joints £10.00

Wages for two workers £150

Total cost for your quote  £190.00

Thankyou Very Much for Considering Crookes Crooked Company and Co i will be looking forward to hearing from you