Monday, 8 October 2012
Repairing Felt underlay wooden battens and tiling
Common defects.
Not levelling out the batten will cause your tiles to be wrong
Also if you don’t get the positioning right for the overhang of the tiles, or the overlay of the tiles you whole roof will look wrong.
materials used
Felt
Batten
Marley Stonewell tiles
Tools, power tools and materials used
Hammer
Batten
Tiles
Felt
Tape measure
Brush
bin
method statement
The first thing we have to do is to view the property and determent how much work is needed and the amount of time it will take. The next thing we will have to do is to get all the required materials and tools. We then will send a quote and if the client is happy we will then proceed with the work. We will first remove the old broken tile batten. Once we removed the broken tile batten and left over felt. We then dispose of it so that we can maintain a tidy work area. After disposing of all the old materials we then measure the space wear the felt has to go plus 100mm extra to go up the sides. Once we measure it we will then use a Stanley knife to cut it to size. We will then attach the felt using galvanised nails. Once the felt is attached we then will attach the batten using galvanised nails and making sure that the batten is all the equal distance apart. once we attached all the batten and felt we will then tidy up making sure that we don’t leave any rubbish on or in the client place.
The first thing we have to do is to view the property and determent how much work is needed and the amount of time it will take. The next thing we will have to do is to get all the required materials and tools. We then will send a quote and if the client is happy we will then proceed with the work. We will first remove the old broken tile batten. Once we removed the broken tile batten and left over felt. We then dispose of it so that we can maintain a tidy work area. After disposing of all the old materials we then measure the space wear the felt has to go plus 100mm extra to go up the sides. Once we measure it we will then use a Stanley knife to cut it to size. We will then attach the felt using galvanised nails. Once the felt is attached we then will attach the batten using galvanised nails and making sure that the batten is all the equal distance apart. once we attached all the batten and felt we will then tidy up making sure that we don’t leave any rubbish on or in the client place.
57 Dale Drive, Patcham, Brighton BN1 8MY
TEL: 01273 506843 Mob: 07654323765 Fax: 0161 728 3172
RISK ANALYSIS SHEET
Activity / Operation ~ Replacing felt and wooden batten and tiles
Identifying Hazard ~ Flying Debris / Dust / Electric Shock/ Noise
**************************************************
RISK ASSESSMENT
SEVERITY LIKELIHOOD
High € Fatality, Major Injury or High € Certain or Near Illness Causing Long Term Certain to Occur.
Disability
Medium € Injury or Illness Causing Medium € Reasonably Likely
Short Term Disability. To Occur
Low € Other Injury or Illness Low € Very Seldom or Never occurs
**************************************************
S/L RATIO
Plot assessment of SEVERITY
L/M M/M H/M
H/H: Avoid wherever possible.
L/L M/L H/L L/L: minimal risk.
******************************************************
SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK
Protective equipment - Gloves / Goggles or safety glasses / Dust Mask / Safety Shoes / Scaffolding / safety netting
A qualified electrician must make all electrical connections. All test PAT Test certification is in place.
Quote:
Mr Walker
Horesham
365 Blueberry Lane
BN8 9JL
After my trip to your property I have assessed what needs doing and have attached a quote, I will need two highly trained labourers with me as there will be a lot of work to get through, it should take us approximately 3-5 days. We will assure that while we are away your roof with have plastic sheeting over it to keep it safe if any rain occurs.
Materials:
Felt underlay £40
Treated wooden battens £50
Tiles £150
Galvanised clout nails £10
Labour costs:
3x labourers £50 daily rate £600
Overhead costs:
Company van/ petrol costs: £50
Permits (parking and leaving materials on roadside) £80
Rubbish removal:
Hire company at end of job to take away old materials £100
Total pricing for job:
Travelling: shipping: labour: P+P: Total £1080
Vat (17.5%) £189
Total Price including V.A.T = £1269
Thank you very much for picking Crookes Crooked Construction & Co.
No comments:
Post a Comment