Replacing plastic pipe, replacing a waste system and fitting a new hand basin


Thursday, 8 November 2012

Replacing plastic pipe, replacing a waste system and fitting a new hand basin

Common defects in replacing plastic pipe/replacing a hand basin/ repairing plastic waste system:
·       Dodgy cuts
·       Length being to short/long
·       Wrong size pipe
·       Sink no being level
·       Taps loosening
·       Dripping taps
·       Pipes not at a slant so the water doesn’t flow
·       Seals not put in properly causing leakage
·       Washers breaking
Common materials used:
·       Plastic piping
·       Washers
·       Rubbers
·       Olives
·       Plastic push fittings
·       Plastic screw fittings
·       Waste system
·       China basin
·       Metal taps
·       Metal screw fittings
·       Screws
·       Pipe bracket
·       Shut off valve
Possible defects in materials:
·       Washers breaking over time
·       Taps dripping as they get older and used more
·       Taps loosening over time as being used constantly
·       Plastic fittings loosening/ slow breaking down due to wear and tear over time
Tools power tools and materials:
·       Screws
·       2x water pump pliers
·       Screw driver
·       Battery drill
·       Screwdriver bit
·       Plastic push fittings
·       Metal screw fittings
·       Plastic screw fittings


57 Dale Drive, Patcham, Brighton  BN1 8MY
TEL: 01273 506843   Mob: 07654323765   Fax: 0161 728 3172                  
RISK ANALYSIS SHEET
Activity / Operation ~    Replacing plastic piping, plastic waste system and china basin
Identifying Hazard ~                       small work area, delicate materials, possible leakage
**************************************************
RISK ASSESSMENT
 SEVERITY                                                                   LIKELIHOOD     

High                    Fatality, Major Injury or                                High                    Certain or Near                                 Illness Causing Long Term                                                     Certain to Occur.
                                Disability

Medium           Injury or Illness Causing                               Medium           Reasonably Likely
                                Short Term Disability.                                                                    To Occur        


Low                     Other Injury or Illness                                   Low                     Very Seldom or                                                                                                                                                Never occurs  
**************************************************      
                     S/L RATIO
                                                                                Plot assessment of SEVERITY
L/H         M/H       H/H                                                        vs LIKELIHOOD and highlight                                                                                      value obtained.
                L/M        M/M      H/M
                                                                                                H/H: Avoid wherever possible.
L/L          M/L        H/L                                                         L/L:  minimal risk.

                 ******************************************************
SPECIFIC MEASURES REQUIRED TO MINIMISE THIS RISK

Protective equipment - Gloves / Goggles or safety glasses / Safety Shoes


To start off we will shut off the water supply and put in temporary stoppers, and then we will turn the water back on so that the rest of the property can have a water supply. We will then take out all the old piping, the old basin, the old plastic waste system ready to put the new one in. We will begin by putting the basin where ever you would like it to be, then from there we will install the waste system and work our way back the water supply. Afterwards we will test it all for leaks and to make sure it all works correctly and safely. We will also make sure the job is completed to your satisfaction.

Quote:
Mr Gunn
Moulscoombe
73 Moulscoombe way
BN2 6NF
After my trip to your property I have assessed what needs doing and have attached a quote, I will need one highly trained labourer with me as there will be a lot of work to get through, it should take us approximately 2-4 days as long as there is no unforeseen problems. We will assure that while we are away from your property that you will have running water as usual.
Materials:
Plastic piping £30
Plastic, metal and push fittings £15
Brackets, washers, rubbers £10
Basin £50
Screws £3
Waste system £10
Metal taps £15
Labour costs:
2x labourers £50 daily rate £400
Overhead costs:
Company van/ petrol costs: £50
Total pricing for job:
Travelling: shipping: labour: P+P:                              Total £583
Vat (17.5%)                              £23.33
Total Price including V.A.T      = £606

Thank you very much for picking Crookes Crooked Construction & Co. WE look forward to hearing from you our contact details are as follows: